UNDERSTANDING MECHANICS OF FIBERS IN STAINLESS STEEL TUBE

Intermittent Bonded Ribbon Production Line For Sale

A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.

Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. The published product information covers capabilities, technical details, and supplied systems, helping U.S. buyers begin evaluating the equipment against their manufacturing needs.

Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. Doing so can clarify which specifications and options are relevant to your facility and production objectives.

The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. Submitting a clear request for pricing and specifications can help you move forward with the assessment.




Important Points To Consider

  • The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
  • This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
  • The product listing describes machine capabilities, technical specifications, and supplied systems.
  • Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
  • The supplier provides a business address in Songjiang District, Shanghai.

Overview Of The Intermittent Bonded Ribbon Production Line

The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Equipment Designed For Twelve- And Sixteen-Fiber Rollable Ribbon Production

The machine configuration accommodates two different fiber counts in rollable ribbon designs. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.

How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations

According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.

These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. These bond-spacing figures describe examples of the design approach and should not be interpreted as stated equipment settings.

  • Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Adaptable handling when the ribbon takes different shapes.

Applications In Optical Fiber Cable Manufacturing

Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.

Compact Cable Designs And High Fiber Density

An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.

Ribbon Organization For Efficient Fusion Splicing

This design supports orderly fiber handling during splicing while providing flexibility for subunit movement in the assembly process. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.

Design characteristic Potential use Consideration for buyers
Flat fiber configuration Mass fusion splicing Verify the needs of your splicing process
Ribbon configuration that folds or rolls Space-efficient cable packaging Review the overall cable construction
Payoff reels with capacities of 25.2 km and 50.4 km Planning material-handling operations Match the reel capacity to production operations

Production Line Specifications And Performance

Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Reel compatibility and facility utility requirements are also important considerations for installation planning.

Production Speed, Fiber Diameter, And Attenuation

According to the specifications, the construction speed reaches 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.

Payoff And Take-Up Reel Compatibility

The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.

Site Utilities And Environment

The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Check all utility connections in advance of installing the equipment.

Specification Listed requirement Installation planning note
Reels for fiber payoff Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Verify reel dimensions and weight
Take-up reel T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel Confirm compatibility with your selected format
Electrical and environmental requirements Power supply of 380 V ±10%; temperature of 15 to 25°C; humidity ≤85% Prepare a dry, clean, draft-free operating area
Gas utility supply Nitrogen at 7 bar and 99.99% purity; compressed air at 6 bar Check available gas capacity before equipment setup

Fiber Payoff And Gathering Equipment

The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. The associated controls help maintain a steady supply of fiber while reducing handling risks.

Tension-Controlled Payoff System For Sixteen Spools

The active payoff accommodates 16 spools, incorporates traversing, and permits independent tension adjustment. Each spool has a maximum weight capacity of 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.

Fiber Guiding, Break Detection, And Electrostatic Control

U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. A break-detection system and alarms notify operators when problems occur. Protective guards and pneumatic clamping provide additional support for safe material handling. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.

Component Specified details Purpose
Payoff 16 spools with a maximum of 10 kg each Feeds optical fibers with traversing movement
Tension and motor Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W Supports regulated payoff of fibers
Guidance and safety Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp Directs fibers and supports safe handling
Static control Rod-style electrostatic collector with anti-static devices Helps reduce dust near fiber routes

Precision Molding And Intermittent Adhesive Dispensing

Operators can adjust adhesive positioning and mold alignment through the forming platform. Available adjustments help configure the process for each required ribbon format.

Adjustable IBR Mold Platform For Ribbon Formation

Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Grouped precision dispensing valves are installed on slide tables so operators can refine their alignment and place adhesive dots carefully.

Configurable Nozzle Arrangements For Twelve- And Sixteen-Fiber Ribbons

For 12-fiber ribbons, the specified arrangement consists of 5+5+1 valves. The 16-fiber format is produced using a 5+5+5 valve layout. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. The process calls for a specialized adhesive suitable for both coating and curing.

Process setting 12-Fiber Format 16-Fiber Format
Valve arrangement Valve arrangement of 5+5+1 Valve arrangement of 5+5+5
Mold adjustment Adjustment range of 0 to 15 mm Adjustment range of 0 to 15 mm
Mold-base temperature Temperature range of 20°C to 60°C Temperature range of 20°C to 60°C

Curing Bonded Fiber Ribbons With UV-LED Technology

Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. The arrangement of the ovens and their published operating values provide buyers with information for evaluating process compatibility.

Initial Pre-Curing And Main Curing Operations

Pre-curing is handled by three specialized 800 W LED-UV ovens. Fibers from each mold group pass through their respective pre-curing unit before entering the principal 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.

Managing Nitrogen Supply And Curing Performance

The nitrogen flow rate and pressure can be adjusted by hand. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. The manufacturer states that lamp-array power use remains at or below 80% of total power during steady, continuous operation at production speed. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Discuss how the operating settings may change depending on the adhesive and materials selected.

Visual Monitoring, Capstan, And Take-Up

Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.

Online Inspection Of Fiber Color Sequence And Adhesive Dots

A microscope and camera provide enlarged images in real time. The display allows operators to check the sequence of fiber colors and confirm adhesive resin dots at each dispensing position. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.

Precision Take-Up With Servo-Controlled Traction

The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.

Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. The cable pitch setting allows continuous adjustment from 1 to 6 mm. A photoelectric sensor monitors position and assists with reversing direction. Confirm that the operating conditions and settings are suitable for your target cable design with the supplier.

Electrical Controls And Production Monitoring

Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.

Operating The Production Line Through PLC And Touchscreen Controls

The ribbon production line uses Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch Siemens touchscreen interface. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.

Settings, Alarms, And Length-Based Stops

Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.

A preset length can be entered to initiate slowing or stopping of the machine. This provides a practical way to control the end of a cable production run. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.

Control-system feature Published specification Use
PLC controls and operator display Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen Adjust and review operating information
Electrical components Schneider Electric low-voltage switchgear Provides support for system control
Equipment monitoring and shutdown control Operating data for lamps, ovens, runtime, and meters; preset-length function Monitor production and stop or decelerate the equipment

Ribbon Quality, Material Selection, And Process Compatibility

The selected adhesive influences coating uniformity and the quality of the finished ribbon. The manufacturer calls for a specialized adhesive intended for the machine’s coating and curing process instead of an ordinary multipurpose product.

Specialized Adhesive Used For Bonding And Curing

The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Adhesive flow to each dispensing point is managed using precision pressure-control valves. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.

Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. Preventing unintended exposure matters because adhesive behavior could be affected before the material reaches the fiber surface.

Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Discuss the material’s expected performance across your planned application and run duration. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.

Equipment Installation Needs And Supplied Documentation

Prepare the installation area and necessary utility connections before arranging equipment setup. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Facility Conditions And Buyer-Supplied Connections

The machine should be positioned inside a draft-free, enclosed workspace that is clean and dry. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. Provide nitrogen at 7 bar and 99.99% purity, along with compressed air at 6 bar.

The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.

Documentation For Operation, Installation, And Maintenance

Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.

  • Operating and instruction manuals together with the overall equipment layout drawing
  • Electrical schematics, wiring diagrams, and drawings for installation and maintenance
  • Purchased-component instructions and a wear-parts list to support service preparation

The supplied records support preparation for commissioning and routine servicing of the cable production machinery.

Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements

Begin by identifying the ribbon formats you intend to manufacture and sell. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.

Verify take-up reel compatibility before placing an equipment order. A standard IBR reel measures Φ410 × Φ50.8 × 390 × Φ310 mm, accommodates a maximum weight of 30 kg, and allows cable pitch settings between 1 and 6 mm. Check that these specifications suit your production facility and material-handling operations.

The compatibility of payoff spools should be reviewed as well. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Request precise reel measurements before selecting materials or determining production run lengths.

In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Before ordering, review equipment configuration and startup requirements directly with Shanghai Weiye. A thorough compatibility assessment can help prevent expensive modifications later.

Planning point Listed detail Required buyer verification
Ribbon configurations and operating speed 12F, 16F; specified speed of 600 m/min Match the specifications to manufacturing goals and product range
Take-up Maximum 30 kg; cable pitch of 1 to 6 mm Check reel compatibility and facility requirements
Fiber payoff reel options 25.2 km, 50.4 km, and 63 km spool capacities Confirm the precise reel measurements

How To Request A Quotation For The Intermittent Bonded Ribbon Production Line

For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Use these specifications to determine whether the machine is appropriate for your intended cable application.

A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.

Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Ask the supplier how these parameters relate to the chosen materials and required surface quality.

Consult the product page for the published equipment description. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The supplier provides its address as 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. Providing complete information in your quote request makes the following stages easier to clarify.